Workstation – Business Overview

Workstation is a setup document in Dafater used to define and manage individual production stations on the shop floor. A Workstation represents a physical or functional area where specific manufacturing activities are performed, such as cutting, assembling, welding, testing, or packaging. It helps businesses organize production capacity, plan work accurately, and monitor operational efficiency.


What Workstation Is Used for in Business Operations

In daily operations, Workstation acts as the reference point for: - Where a specific production task is carried out
- How much capacity is available at that location
- What costs are associated with using that station
- Which operations can or cannot be performed there

By clearly defining Workstations, businesses gain better visibility and control over how production work is distributed and executed.


Prerequisites or Setup Requirements

Before using Workstation effectively, the following should be in place: - A clear understanding of the production layout (machines, lines, or work areas) - Defined manufacturing processes or steps - Standard working hours or shifts for production - Agreed cost assumptions for running each station (such as labor or machine usage)

Workstation is typically set up early during manufacturing configuration and updated as production capacity changes.


Typical Workflow and Role in Business Processes

  1. Define the Workstation
    Each production area or machine group is created as a Workstation with its capacity and availability.

  2. Link to Production Activities
    Manufacturing steps are assigned to the appropriate Workstation based on where the work actually happens.

  3. Production Planning
    When production orders are created, Dafater uses the Workstation details to plan timelines and workload.

  4. Execution and Monitoring
    As work is carried out, the Workstation helps track utilization, identify bottlenecks, and ensure realistic delivery commitments.

This ensures production plans are aligned with real operational capacity.


Key Business Scenarios Where Workstation Is Essential


Important Considerations for Users


In summary, Workstation is a foundational setup in Dafater’s manufacturing process. It bridges the gap between production planning and actual shop-floor execution, helping businesses produce efficiently, control costs, and deliver on time.

Basic Information

Fields

Field Name Label Type Required Options Description
workstation_dashboard Workstation Dashboard HTML - Visual dashboard showing real-time workstation performance and status in Dafater
workstation_name Workstation Name Data - Unique name identifying the workstation within Dafater operations
workstation_type Workstation Type Link Workstation Type Category defining workstation capabilities and production characteristics
plant_floor Plant Floor Link Plant Floor Plant floor location where the workstation is physically installed
production_capacity Job Capacity Int - Maximum number of jobs the workstation can handle concurrently
warehouse Warehouse Link Warehouse Default warehouse for materials and outputs linked to workstation
status Status Select Production, Off, Idle, Problem, Maintenance, Setup Current operational status of the workstation for production planning
onstatusimage Active Status Attach Image - Image representing workstation when actively running
offstatusimage Inactive Status Attach Image - Image representing workstation when inactive or stopped
hourrateelectricity Electricity Cost Currency - Hourly electricity cost incurred while operating the workstation
hourrateconsumable Consumable Cost Currency - Hourly cost of consumables used during workstation operations
hourraterent Rent Cost Currency - Hourly rental or space cost allocated to the workstation
hourratelabour Wages Currency - Hourly labor wages associated with operating the workstation
hour_rate Net Hour Rate Currency - Total calculated hourly operating cost of the workstation
description Description Text - Additional details describing workstation purpose and usage
holiday_list Holiday List Link Holiday List Holiday schedule affecting workstation availability and planning
working_hours Working Hours Table Workstation Working Hour Defined daily working hours schedule for the workstation
totalworkinghours Total Working Hours Float - Total calculated working hours based on assigned schedules

Child Tables

Working Hours (Workstation Working Hour)

Field Name Label Type Required Options Description
start_time Start Time Time - Scheduled beginning time for workstation operations.
hours Hours Float - Total working hours configured for the workstation period.
end_time End Time Time - Scheduled ending time for workstation operations.
enabled Enabled Check - Indicates whether this working hour record is active.

Permissions

Role Read Write Create Delete Submit Cancel
Manufacturing User
DocType Relationship Module
Downtime Entry Linked from Manufacturing
Job Card Linked from Manufacturing
Operation Linked from Manufacturing
Holiday List Links to Setup
Plant Floor Links to Manufacturing
Warehouse Links to Stock
Workstation Type Links to Manufacturing