BOM Comparison Tool
Overview
BOM Comparison Tool – Business Overview
Module: Manufacturing
Page Title: BOM Comparison Tool
What this page is used for in business operations
The BOM Comparison Tool in Dafater is used to compare two Bills of Materials (BOMs) side by side. From a business perspective, it helps manufacturing, procurement, costing, and production teams understand what has changed between two product structures.
This tool supports better decision-making when:
- A product design is revised
- Costs need to be analyzed before approving changes
- Suppliers or materials are being replaced
- Production teams need clarity on updated components
It ensures that changes in materials, quantities, or structure are visible, controlled, and well understood before execution.
Key features and functionality (business perspective)
From a business standpoint, the tool provides:
- Side-by-side comparison of two BOMs
- Highlights differences in components, quantities, and structure
- Clear visibility of changes
- Easily see what items were added, removed, or modified
- Support for cost and impact analysis
- Helps assess how BOM changes may affect material cost and production planning
- Version and revision clarity
- Useful when comparing an older BOM with a revised or proposed one
- Improved cross-team communication
- Aligns engineering, production, procurement, and finance teams on BOM changes
The focus is not on editing, but on reviewing and validating differences before business approval.
How to navigate and use the page effectively
Open the BOM Comparison Tool
- Access it from the Manufacturing area in Dafater.
Select the two BOMs to compare
- Choose the “BOM A” (original or current version)
- Choose the “BOM B” (new, revised, or alternative version)
Run the comparison
- The system displays both BOMs in a structured comparison view.
Review highlighted differences
- Focus on changes in:
- Items
- Quantities
- Hierarchy or sub-assemblies
- Focus on changes in:
Use insights for decision-making
- Decide whether to approve, reject, or revise the new BOM based on business impact.
This page is typically used as a review and validation step, not for data entry.
Common business scenarios where this page is used
- Engineering change management
- Comparing an old BOM with a revised design before approval
- Cost optimization initiatives
- Reviewing alternative materials or quantities to reduce production cost
- Supplier or material substitution
- Ensuring replacements do not disrupt production requirements
- Pre-production review
- Validating BOM accuracy before releasing it to the shop floor
- Audit and compliance checks
- Demonstrating traceability of changes in product structure
Important information displayed on the page
The page typically shows:
- BOM identifiers and versions being compared
- List of components in each BOM
- Differences highlighted clearly, such as:
- Added items
- Removed items
- Quantity changes
- Structural differences, if sub-assemblies are involved
This information allows business users to quickly understand the impact of BOM changes without manually reviewing multiple documents.
Business Value Summary
The BOM Comparison Tool in Dafater acts as a decision-support tool for manufacturing operations. It reduces errors, improves transparency, and ensures that BOM changes are reviewed carefully before they affect production, cost, and delivery commitments.